| Project Features • Placement of temporary cableway anchors on Cairngorm Mountain • Highest anchors ever installed in the UK • Ischebeck Titan or Platipus anchor systems used • Work carried out during winter months with windchill temperatures down to minus 30 degrees centigrade and wind speeds in excess of 80kph • All work subject to severe environmental constraints, the area designated a World Heritage Site • Anchors installed into a wide variety of ground conditions, necessitating various drilling and grouting techniques |
![]() |
||||
![]() |
|||||