Project Features

• Placement of temporary cableway anchors on Cairngorm Mountain

• Highest anchors ever installed in the UK

• Ischebeck Titan or Platipus anchor systems used

• Work carried out during winter months with windchill temperatures down to minus 30 degrees centigrade and wind speeds in excess of 80kph

• All work subject to severe environmental
constraints, the area designated a World Heritage Site

• Anchors installed into a wide variety of ground conditions, necessitating various drilling and grouting techniques